Fidus India Automation Pvt. Ltd.
Automotive

Urgent line-down spares for an automotive stamping plant

Sample case study showing how Fidus India sourced critical sensors and pneumatic spares to restore a stalled stamping line.

Sample content — editable in the CMS

Requirement / Challenge

A press line was down due to failed proximity sensors and a pneumatic valve bank that were no longer locally available. Every hour of downtime meant lost production.

Solution Supplied

Our team identified genuine equivalents, confirmed compatibility, and arranged expedited supply from authorised channels — coordinating logistics to meet the plant’s deadline.

Result / Outcome

The line was restored within the committed window, and the client standardised future spares procurement through Fidus India.